We will respond to your requests for lightweight filling by FCB Method (foamed mixture lightweight soil method), filling of buried gas/water pipelines, and design and construction of various cavity filling at tunnels, underground caves and others.
We will recommend a plan and propose a design and a construction schedule in various projects including widening of in-service road, filling of steep sloping land, reducing earth pressure at bridge abutment, improvement of low-head of tunnel inlet and uneven earth pressure, various lightweight filling and replacement filling at airports/ports, filling of large pipelines such as water, gas and electric power supply, closure works of various hollows at old mine site, air-raid shelter, and cavity filling works including backfilling at tunnels.
We will respond to your requests for the design and construction of ground improvement to solve your problems of weak ground in construction and civil engineering.
Best recommendation will be provided from our wide variations of technology, with deep- and mid- mixing methods.